Cargo Operations Complete Guide 2026

Master cargo operations for all vessel types. Loading, discharge, stowage, and cargo care procedures explained.

Quick Answer

Cargo operations require a cargo plan approved by the Master, pre-loading condition check, continuous draft surveys, hatch inspection, and compliance with the vessel's Cargo Securing Manual. The Chief Officer is responsible for all cargo loaded, stowed, and discharged safely.

Cargo operations cover everything from receiving cargo alongside to securing it for sea and discharging it intact at the next port — and getting this wrong is one of the fastest ways for a ship to end up in trouble, whether through cargo damage claims, port state detention for a failed hatch cover test, or worse, structural damage from loading out of sequence. For a deck officer, especially the Chief Officer who carries direct responsibility for the cargo plan, this is not paperwork sitting alongside the “real” job — it is the job.

Building a Cargo Plan That Respects the Ship’s Limits

Before a single crane hook touches cargo, the Chief Officer works out a stowage and loading sequence using the ship’s loading computer (or manual calculations on older tonnage) to keep bending moment, shear force, and GM within class-approved limits throughout the operation, not just at completion. Loading heavy parcels into end holds first, or discharging in the wrong order, can push hull girder stress past permissible limits well before the ship is fully loaded or empty — this is exactly how ships have broken their backs alongside. The plan also needs to account for tank top loading limits, especially with dense cargoes like iron ore fines loaded into holds designed with lighter cargo in mind. A good plan is shared with the terminal in advance so loading rates and sequence match what the stevedores can actually execute.

Different Cargoes, Different Rules

“Cargo operations” is really several distinct disciplines wearing one name. Bulk cargo brings its own hazards — trimming to avoid cargo shift, and for concentrates and some ores, checking moisture content against the Transportable Moisture Limit to rule out liquefaction risk before the ship ever leaves the berth. Break-bulk and project cargo depend on proper dunnage, correctly rated lashing points, and securing arrangements calculated for the actual voyage and expected weather, not copied from the last similar job. Containerized cargo lives and dies by lashing according to the Cargo Securing Manual’s approved lashing patterns, with stack weights and VGM figures checked against what’s actually declared — container stack collapses at sea are almost always traceable to a lashing or weight-verification shortcut. Liquid bulk on tankers adds inert gas management, tank cleaning between grades, and crude oil washing considerations that solid cargo never touches.

Securing Cargo and Verifying Watertight Integrity Before Sailing

Cargo that shifts at sea is a stability and structural hazard, not just a commercial one, so securing arrangements specified in the vessel’s approved Cargo Securing Manual are not optional extras — they’re checked before letting go, and re-checked if heavy weather is forecast on the voyage. The same discipline applies to hatch covers: compression bar clearances, rubber packing condition, and drainage channels need inspection, and ultrasonic or hose testing before a wet-cargo or long ocean passage catches leaks that a visual check alone would miss. A hatch cover that fails at sea in heavy weather turns into a major water ingress event and, commercially, a cargo damage claim the ship’s insurers will scrutinize closely.

Who Does What: Planning, Watchkeeping and Paper Trail

The Chief Officer plans and takes overall responsibility for cargo operations, but execution depends on the deck watch during loading and discharge — monitoring loading rate against the plan, tracking draft and trim as cargo goes on or comes off, watching for any listing or unexpected settling, and keeping the gangway and mooring lines properly tended as the ship’s freeboard changes throughout the operation. None of this happens without documentation to match: the mate’s receipt records what was actually received in what apparent condition, forming the basis for the bill of lading the shipper relies on commercially, while the stowage plan becomes the ship’s official record of where everything sits. Discrepancies between what’s declared and what’s actually loaded — quantity, condition, or hazard classification — belong in a letter of protest immediately, not sorted out later from memory. Get the paperwork right and a genuine cargo dispute becomes a manageable claim; get it wrong and an honest ship ends up carrying liability that was never really hers.

Chat with SailorGPT

Frequently Asked Questions

What is a cargo plan and why is it mandatory?

A cargo plan is a graphical representation of how cargo will be distributed across all holds and tanks showing each cargo lot, quantity, stowage position, and sequence of loading. It is prepared by the Chief Officer and approved by the Master before loading commences. The cargo plan ensures ship stability, stress limits, and shear force limits are not exceeded throughout the voyage.

What is a draft survey and when is it carried out?

A draft survey calculates the actual weight of cargo loaded or discharged by measuring the ship's displacement before and after the operation. Drafts are read at six positions (forward, midship, aft on both sides), corrected for trim and list, and the displacement difference gives cargo weight. Draft surveys are conducted before and after loading or discharge and serve as the official cargo quantity record.

What are the responsibilities of the Chief Officer during cargo operations?

The Chief Officer is responsible for: preparing and executing the cargo plan, monitoring ship's stability and stress throughout operations, supervising hatch opening and closing, inspecting cargo condition before loading, ensuring proper dunnage and securing, conducting pre-loading cargo holds inspection, maintaining accurate cargo documents, and coordinating with the terminal and stevedores.

What IMDG Code requirements apply to dangerous goods on ships?

IMDG Code (International Maritime Dangerous Goods Code) classifies dangerous goods into 9 classes. Ships must verify: the shipper has provided a dangerous goods declaration, goods are correctly packaged and labelled, segregation requirements between incompatible classes are met, the cargo plan shows DG positions, crew are trained for the specific classes carried, and the vessel has required emergency equipment. Non-compliance is a serious PSC detention offence.

Part of the Maritime Learning Hub

Explore all IMU CET prep, COC exams, STCW courses, and ship operations guides in the complete guide.

← Back to Maritime Learning Hub

Still have questions? SailorGPT has answers — free, honest, experience-based guidance.

🤖 Ask SailorGPT — Exam Prep Help

Free to start · ₹99/month to unlock full access

🩺 Free Financial Health Check

You're learning the technical side. Don't ignore the financial side.

Emergency Fund · Term Insurance · Health Cover · Debt · Investments — 5 questions. Instant score. Free.

Check My Financial Health — Free →
Ask SailorGPT AI Talk to Chief